top of page

The Build Update 1/4/19

  • Writer: Trent Comer
    Trent Comer
  • Jan 4, 2019
  • 1 min read

As the components arrive, they are being installed.

The filing cabinets are now connected together by the walnut counter top.

The 3 manuals, 2 touch monitors, mouse and 2 usb hubs are all connected to the computer.

It is playable, but the manuals are moving while you play. I need to find someone to design and build the case for the manuals.

The speakers has arrived, but I need to work out the shelf for them.

Also, the backup battery (1500VA/900W) has been installed.





 
 
 

Comments


bottom of page